• Replacement of 2000 linear ft. of seawall
• 2000 linear ft. of road path
• 220 piles and 220 panels
• Installation and drainage pipes and flow control valves
Everyone is wondering what is going on as neighbors report that the entire crew is off the property along with their equipment. A big hole has not been filled in on what is the new parking lot. Also a few more palm trees must be relocated in order to accommodate the widening of the new lot.
This should have gone to the Commission when the design changed. Instead, we now have an engineering firm that says it has completed the project. We are left with an unfinished parking lot that is nothing but dirt because we have not caved in and paid a change order. I believe the intent of the City is to get bids from new firms to finish the work.
1 comment:
Hey Loretta and Mary, didn't Joe do a great job on our park? Are you sad some "extra money" from change orders nobody knew about didn't get funneled your way ? It costs lots of money to put out illegal fliers to a whole town , doesn't it ?
Post a Comment